ZhongSai steel structure manufacturing base aerial panorama

Steel Engineering · Manufacturing · Global Delivery

From drawings to construction site

Integrated design, fabrication and export delivery for overseas steel structure projects. One team across the critical stages.

15+ yrsExport experience
100Km2Manufacturing base
100KtAnnual capacity
60+Countries

Engineering & Manufacturing

Proof from design to container

In-house structural team handles design, detailing and connection design. Dongguan and Huizhou bases manage cutting, welding, inspection and coating. Component marking, packing lists and loading plans are delivered together.

Engineering & Detailing Fabrication & QC Packing & Export Installation Support
View Manufacturing →
Welding at ZhongSai manufacturing base

Export Delivery

Recent Export Shipments

ZhongSai records the packing, container loading and export preparation of structural steel components for overseas projects. Watch recent shipment activity.

View All Shipment Videos →
发货

发货

发货装柜

发货装柜

钢结构出口出货前质量检查 | Steel Structure Quality Inspection Before Shipment #钢结构 #钢结构出口

钢结构出口出货前质量检查 | Steel Structure Quality Inspection Before Shipment #钢结构 #钢结构出口

钢结构打包装柜实拍包装规范,方便运输和现场卸货安装。我们做好生产端和出口端,配合当地包工头顺利推进项目。。 #steelstructure  #prefabricatedbuilding

钢结构打包装柜实拍包装规范,方便运输和现场卸货安装。我们做好生产端和出口端,配合当地包工头顺利推进项目。。 #steelstructure #prefabricatedbuilding

Delivery Process

How your project moves forward

01Project ReviewLocation, use, dimensions and drawing requirements
02Engineering & DetailingStructural design, connection detailing
03Manufacturing & QCCutting, welding, inspection, surface treatment
04Packing & ExportComponent marking, packing list, container loading
05Installation SupportErection drawings and technical guidance

Start Your Project

Planning a steel structure project?

Tell us your project location, use and drawings. Our engineering team will respond within 1 business day.

Get Project Solution & Quote

Upload drawings if you have them; or submit basic project requirements if not. Leave any uncertain details for later discussion.

Click or drag files here
PDF, DWG, DXF, JPG, PNG, XLS, XLSX — max 25MB per file
Advanced Options (Optional)

If you know the following, it helps us review your project faster. Leave blank if unsure.

By submitting, you agree to our privacy policy. We will not share your information.

WhatsApp WeChat Email Support
WhatsApp WeChat