Home/Contact

PROJECT INQUIRY

Discuss Your Steel Structure Project

Whether you already have drawings or are still at the planning stage, ZhongSai's in-house design and delivery teams can review your project requirements and coordinate the next steps.

Start Your Project Inquiry
ZhongSai steel structure manufacturing facility

Two Ways to Start Your Project Inquiry

I Have Drawings

I have architectural, structural, BOQ or preliminary drawings.

  • Structural drawings
  • Architectural drawings
  • BOQ / material list
  • Project specifications
  • Reference drawings or project files

Supported files: PDF, DWG, DXF, JPG, PNG, XLS, XLSX

Upload Project Drawings

I Don't Have Complete Drawings Yet

I have a project concept, dimensions or construction requirements.

  • Project Country
  • Building Type
  • Intended Use
  • Approximate Dimensions
  • Crane / Equipment Requirements
  • Other project requirements

You do not need to prepare information that is not yet available. Our engineering team can help clarify requirements.

Tell Us About Your Project

Information That Helps Us Understand Your Project

01 Project Country
02 Building Type
03 Intended Use
04 Available Dimensions
05 Drawings / BOQ
06 Crane Requirement (if applicable)
07 Applicable Project Specifications (if available)
08 Current Project Stage / Requirements

Provide what is currently available. Additional information can be clarified during project communication.

What ZhongSai Can Support

Design & Detailing Support
Steel Fabrication
Structural Steel Components
Packing & Container Loading
Export Documentation Support
Logistics Coordination
Overseas Installation Technical Guidance

ZhongSai is a steel structure manufacturer and export supplier. Local erection and construction are handled by the customer or local construction team. ZhongSai may provide overseas installation technical guidance according to project requirements.

Frequently Asked Questions Before Contacting

Is ZhongSai a manufacturer or trading company?

ZhongSai is a steel structure project supplier with an in-house design/detailing team, Guangdong manufacturing bases and a project delivery team. We handle export, project management and manufacturing coordination. Steel components are fabricated at our Guangdong production bases.

Can I request a quote without drawings?

Yes. Please provide the project country, building type, intended use, available dimensions (length/width/height) and other known requirements. ZhongSai can conduct an initial project assessment based on basic information, with detailed materials supplemented during follow-up communication.

How long does it take to get a quote?

For projects with complete drawings and BOQ, we typically provide an initial quote within 1-3 business days. For projects with only basic parameters, structural scheme confirmation is required first, and the timeline depends on project complexity.

Can I visit the factory?

Qualified project clients can schedule visits to ZhongSai's Guangdong production bases for manufacturing capability and quality control verification. Please contact our project team in advance to arrange a visit.

Does ZhongSai provide local construction and installation?

ZhongSai provides design/detailing, fabrication, export supply and installation technical guidance. Local civil works, physical construction and on-site erection are normally handled by the client or local contractors. On-site technical personnel can be arranged for specific projects subject to contract scope.

What is the fastest way to contact ZhongSai?

WeChat is ZhongSai's primary contact channel — add us and send drawings and project requirements directly. You can also reach us via WhatsApp (+86 131 9200 7378) or email ([email protected]).

What Our Engineering Team Reviews

Your project information goes through an initial engineering review, not just a sales inbox.

Project Location

Country, city and local design code requirements that affect structural design.

Building Use & Type

Industrial, warehouse, mining, commercial, agricultural or infrastructure application.

Dimensions & Layout

Span, length, eave height, bay spacing and equipment layout requirements.

Structural Drawings

Architectural, structural drawings, BOQ and project specifications for detailed review.

Crane & Equipment Loads

Overhead crane capacity, equipment loads, dynamic loads and vibration requirements.

Shipping & Assembly

Container loading feasibility, member segmentation and site assembly considerations.

What Happens After You Submit?

A clear process from initial submission to project proposal.

01

Project Information Received

Your drawings and project requirements are received and logged in our project tracking system.

02

Initial Engineering Review

Our in-house design team reviews structural feasibility, loads, dimensions and manufacturing requirements.

03

Missing Information Clarification

If additional details are needed, we contact you via WeChat or email to clarify project requirements.

04

Technical & Commercial Discussion

We discuss structural solutions, manufacturing scope, delivery timeline and project coordination details.

05

Proposal Based on Confirmed Scope

A formal project proposal and quotation is provided based on confirmed drawings, scope and requirements.

We aim to respond to qualified project inquiries within 24 hours. Complex projects may require additional engineering review time.

Why Project Owners Choose ZhongSai

In-house

Design & Detailing Team

Our own engineering team handles structural coordination, shop detailing and connection development.

In-house

Project Delivery Team

Dedicated delivery team coordinates production, packing, container loading and export documentation.

~100,000 m²

Manufacturing Base

Guangdong production facilities with controlled fabrication, inspection and quality management.

60+

Export Countries

Project delivery experience across Southeast Asia, Middle East, Africa, South America and other regions.

Project Inquiry Form

Have drawings? Upload the available files.

No drawings yet? Fill in the project information you currently have.

Get Project Solution & Quote

Upload drawings if you have them; or submit basic project requirements if not.

Click or drag files here
PDF, DWG, DXF, JPG, PNG, XLS, XLSX — max 25MB per file
Advanced Options (Optional)

If you know the following, it helps us review your project faster. Leave blank if unsure.

By submitting, you agree to our privacy policy. We will not share your information.

Call
WhatsApp Facebook
Start Project