Home/About ZhongSai

ABOUT ZHONGSAI

Steel Structure Manufacturing for Overseas Projects

ZhongSai Steel Structure is a China-based steel structure manufacturer and export supplier supporting overseas factories, warehouses and engineered steel building projects from detailing and fabrication to packing, export coordination and overseas installation technical guidance.

01 · WHO WE ARE

A Steel Structure Manufacturer Built for Export Projects

ZhongSai Steel Structure supports overseas project owners, engineering companies, contractors and procurement teams with structural steel manufacturing and export supply.

Our work focuses on translating confirmed project requirements and drawings into fabricated steel components prepared for export delivery.

Depending on project scope, ZhongSai may support detailing, fabrication, component supply, packing, container loading, export documentation coordination and overseas installation technical guidance.

Local erection and construction are handled by the customer or local construction team.

15+
Years Export Experience
100,000 m²
Production Base
100,000 Tonnes
Annual Capacity
300+
Frontline Workers
02 · COMPANY FACTS

Company Information

Brand Name ZhongSai Steel Structure
Core Business Steel Structure Detailing, Fabrication & Export Supply
Manufacturing Base Dongguan / Huizhou, Guangdong, China
Design Team Structural Design & Detailing Team
Delivery Team Project Delivery & Export Coordination Team
Export Markets 60+ countries: Southeast Asia, Middle East, Africa, South America
03 · MANUFACTURING

Real Factory. Real Manufacturing.

Real photos from our production bases, covering the main processes from steel preparation to surface treatment.

ZhongSai steel structure factory production floor overview
CNC cutting and steel preparation
CNC Cutting
Steel welding and fabrication
Welding
Steel assembly and fabrication workshop
Assembly
Finished coated steel components and surface treatment
Surface Treatment

Approximately 100,000 m² of production base covering cutting, assembly, welding, surface treatment, quality inspection, component marking and packing for export delivery.

04 · WHAT WE SUPPORT

What ZhongSai Supports

01

Design & Detailing Support

Structural design coordination and shop drawing preparation based on project requirements and confirmed drawings.

02

Steel Fabrication

Cutting, assembly, welding, straightening, drilling and custom component fabrication organized according to project drawings.

03

Structural Steel Components

Supply of fabricated steel beams, columns, trusses, bracing, secondary members and cladding systems as required.

04

Packing & Container Loading

Component marking, packing lists and container loading plans coordinated according to component type and export requirements.

05

Export Documentation & Logistics

Export documentation support and logistics coordination for overseas project delivery, organized according to project scope.

06

Overseas Installation Guidance

Installation drawings, video resources and technical guidance to support the customer or local construction team during erection.

ZhongSai Provides

  • Project requirement coordination
  • Design / detailing support
  • Fabrication
  • Component and material supply
  • Packing and container loading
  • Export documentation and logistics coordination
  • Overseas installation technical guidance

Customer / Local Team Handles

  • Local civil and foundation works
  • On-site erection and labor
  • Local permits and statutory approvals
  • Inland transport and lifting on site
05 · QUALITY & CERTIFICATIONS

Quality & Certifications

Certificate numbers and validity periods are listed below. Please refer to each certificate for the certificate holder relationship.

ISO 9001 certificate

ISO 9001

Quality management system certification for steel structure fabrication and project coordination.

Certificate No.: NOA2502483 Validity: 2025 - 2028
ISO 14001 certificate

ISO 14001

Environmental management system certification for steel structure manufacturing operations.

Certificate No.: NOA2502482 Validity: 2025 - 2028
ISO 45001 certificate

ISO 45001

Occupational health and safety management system certification for production facilities.

Certificate No.: NOA2502481 Validity: 2025 - 2028
EU CE Marking (EN 1090) certificate

EU CE Marking (EN 1090)

CE certification for structural steel components, execution class up to EXC2, compliant with EU Construction Product Regulation.

Certificate No.: 1381-CPR-902 Validity: 2024 - Ongoing
ISO 3834-2 Welding Quality certificate

ISO 3834-2 Welding Quality

Comprehensive quality requirements for fusion welding of metallic materials, certified by SGS.

Certificate No.: 24/1028-3834 Validity: 2024 - 2027
Malaysia CIDB IBS certificate

Malaysia CIDB IBS

Industrialised Building System assessment and certification for the Malaysian market, covering metal framing and structural steel components.

Certificate No.: IBS231/039 Validity: 2026 - 2027

Full verification documents can be provided during qualified project discussions.

07 · FAQ

Frequently Asked Questions About ZhongSai

Is ZhongSai a steel structure manufacturer or trading company?

ZhongSai is a steel structure project supplier with a design/detailing team, Guangdong manufacturing bases and a project delivery team. We handle export, project management and manufacturing coordination — not a simple steel trading company.

Where is ZhongSai's manufacturing base?

ZhongSai steel components are fabricated at Dongguan and Huizhou production bases in Guangdong, China, with approximately 100,000 m² of factory area and 100,000 tonnes annual capacity.

Does ZhongSai have its own design team?

ZhongSai has a structural design and detailing team for design coordination, connection detailing, fabrication drawings and manufacturing/transport/assembly interface coordination. Design responsibility is determined by project contract and local regulations.

Who manages overseas project delivery and export?

The project delivery team coordinates production schedules, component marking, packing plans, container loading, export documentation and shipping. Our delivery capability is steel structure project delivery coordination, not international freight forwarding.

Which countries does ZhongSai export to?

ZhongSai steel structure projects are exported to 60+ countries across Southeast Asia, the Middle East, Africa and South America, including Singapore, Malaysia, Indonesia, Saudi Arabia, Nigeria, Brazil and others.

Can customers visit the factory?

Qualified project clients can arrange visits to ZhongSai's Guangdong production bases for manufacturing capability and quality control verification. Please contact our project team in advance to schedule a visit.

What certifications does ZhongSai hold?

ZhongSai and its manufacturing bases hold ISO 9001 Quality Management, ISO 14001 Environmental Management, ISO 45001 Occupational Health & Safety, EU CE (EN 1090 EXC2), ISO 3834-2 Welding Quality, and Malaysia CIDB IBS certifications. Please refer to certificate details for the certificate holder relationships.

Does ZhongSai provide local construction and installation?

ZhongSai provides design/detailing, fabrication, export supply and installation technical guidance. Local civil works, physical construction and on-site erection are normally handled by the client or local contractors. On-site technical personnel can be arranged for specific projects subject to contract scope.

08 · SEND REQUIREMENTS

Have Drawings or a Project Requirement?

If you have drawings or a BOQ, submit them for an initial project assessment.

If drawings are not yet available, provide the project country, building type, intended use and any dimensions you have.

Get Project Solution & Quote

Upload drawings if you have them; or submit basic project requirements if not. Leave any uncertain details for later discussion.

Click or drag files here
PDF, DWG, DXF, JPG, PNG, XLS, XLSX — max 25MB per file
Advanced Options (Optional)

If you know the following, it helps us review your project faster. Leave blank if unsure.

By submitting, you agree to our privacy policy. We will not share your information.

WhatsApp WeChat Email Support
WhatsApp WeChat