Home / Projects / Macau Londoner Project
Macau Londoner Project Project Rendering
Overseas Projects

Macau Londoner Project

Macau, China

Project Rendering
ZhongSai Scope

Steel Structure Detailing, Fabrication & Supply

ZhongSai's participation scope for this project is as indicated above. Actual supply and technical service scope is subject to the mutually confirmed contract and technical documentation.

Project Overview

Macau Londoner project with total steel tonnage of approximately 8,000 tonnes. Includes VIP lobby canopy, Crystal Palace roof, GRC-supported steel frame, performance hall, and other steel structures. Project spanned 2 years, a renovation project characterized by complex structure, high precision requirements, and aesthetically appealing design. Now a must-visit tourist destination.

ZhongSai Scope Details

Steel Structure Detailing, Fabrication & Supply

Note: ZhongSai provides detailing, fabrication, supply and technical installation guidance; export shipping and delivery coordination for overseas projects. Local civil works and physical construction are normally handled by local contractors.

Capability Demonstrated

Based on the confirmed structural type and parameters of this project, ZhongSai demonstrates the following fabrication capabilities:

Complex Component FabricationHigh-Precision Dimension ControlIrregular Steel Structure Fabrication

Have a Similar Project?

Send drawings or project requirements for initial project review and quotation discussion.

Send Project Requirements
Call
WhatsApp Email Facebook
Start Project