Singapore Changi Airport T2 Connect Project Site
Overseas Projects

Singapore Changi Airport T2 Connect

Singapore

Project Site
ZhongSai Scope

Steel Structure Detailing, Fabrication & Export Supply

ZhongSai's participation scope for this project is as indicated above. Actual supply and technical service scope is subject to the mutually confirmed contract and technical documentation.

Project Overview

Singapore Changi Airport Terminal 2 Connect (T2C) project. T2C-Kingpost consists of 209 units with total steel tonnage of approximately 4,600 tonnes. Utilizing CHS50*50mm, UB914*419*446.4 and other materials, with a total of 110,000 D25*100 shear studs. Airport expansion project with complex structure and high precision requirements.

ZhongSai Scope Details

Steel Structure Detailing, Fabrication & Export Supply

Note: ZhongSai provides detailing, fabrication, supply and technical installation guidance; export shipping and delivery coordination for overseas projects. Local civil works and physical construction are normally handled by local contractors.

Capability Demonstrated

Based on the confirmed structural type and parameters of this project, ZhongSai demonstrates the following fabrication capabilities:

Heavy Structural Steel FabricationComplex Connection FabricationHigh-Precision Dimension Control

Have a Similar Project?

Send drawings or project requirements for initial project review and quotation discussion.

Send Project Requirements
Call
WhatsApp Email Facebook
Start Project