Home / Projects / CNPC Sixth Construction Cracking Furnace Project
CNPC Sixth Construction Cracking Furnace Project Project Site
Energy & Petrochemical

CNPC Sixth Construction Cracking Furnace Project

Guangdong

Project Site
ZhongSai Scope

Petrochemical Equipment Steel Frame & Platform Fabrication

ZhongSai's participation scope for this project is as indicated above. Actual supply and technical service scope is subject to the mutually confirmed contract and technical documentation.

Project Overview

A large-scale petrochemical cracking furnace steel structure project, including cracking furnace main frame, equipment platforms and support systems with multi-level equipment platform steel structure.

ZhongSai Scope Details

Petrochemical Equipment Steel Frame & Platform Fabrication

Note: ZhongSai provides detailing, fabrication, supply and technical installation guidance; export shipping and delivery coordination for overseas projects. Local civil works and physical construction are normally handled by local contractors.

Capability Demonstrated

Based on the confirmed structural type and parameters of this project, ZhongSai demonstrates the following fabrication capabilities:

Heavy Structural Steel FabricationComplex Component FabricationComplex Connection Fabrication