Global Steel Structure Export Markets
ZhongSai provides steel structure design, detailing, fabrication, export delivery and installation guidance to projects in 60+ countries.
Key Markets
Markets We Serve
Singapore
LTA MRT stations, Changi Airport cargo centre. Experienced with Singapore codes and quality requirements.
Saudi Arabia
Engineering, fabrication and export delivery for industrial, warehouse and manufacturing projects in Saudi Arabia.
United Arab Emirates
Engineering, fabrication, packing, container loading and export-delivery support for UAE industrial, warehouse and logistics projects.
Other Markets
ZhongSai also serves projects in other Southeast Asian countries, the Middle East, Africa and more. Contact us for specific market experience.
Delivery
From China Factory to Overseas Project Site
Design & Detailing
In-house team details steelwork per project drawings and local codes.
Fabrication & Inspection
100,000 m² manufacturing base with RTO stationed and third-party inspection support.
Export & Delivery
Optimized loading, component marking, export docs and port coordination.
Installation Guidance
Erection drawings and technical clarification for local contractors.
Which Country Is Your Project In?
Tell us your project location and requirements for a tailored technical and delivery proposal.
Inquire About Your Project