Fabricated Structural Steel Supplier in China

ZhongSai Steel Structure supplies fabricated structural steel components for overseas construction and industrial projects, manufactured according to your project drawings, BOQ and technical requirements. We supply fabricated beams, steel columns, welded H sections, box columns, steel trusses, bracing systems, steel platforms, connection plates, brackets and custom fabricated components 鈥?with cutting, drilling, welding, surface treatment, inspection, marking and export packing. 15+ years export experience, 100,000 m² production base, ISO 9001 certified.

馃搻 Send Drawings / BOQ 鈫?/a> 馃搵 Request Component Quote

Fabricated Structural Steel Components

Manufactured to your drawings 鈥?not raw steel trading.

馃搻

Fabricated Steel Beams

H beams, plate girders, crane runway beams, rafters, lintels. Cut to length, drilled, welded with stiffeners and connection plates, surface treated.

馃彌锔?/div>

Steel Columns

Wide-flange columns, built-up columns, box columns, stepped columns, crane columns. Base plates, brackets, gusset plates welded per drawings.

馃敥

Welded H Sections

Custom welded H-beam sections from flange and web plates. Non-standard sizes, heavy sections, built-up members for specific load requirements.

馃摝

Box Sections / Box Columns

Welded box columns and rectangular hollow sections. Four-plate assembly, internal diaphragm welding, for high-load and multi-story applications.

馃彈锔?/div>

Steel Trusses

Roof trusses, crane trusses, bracing trusses, pedestrian bridge trusses. Chord and web member fabrication, gusset plate welding, assembly.

鈿欙笍

Bracing Systems

Cross bracing, diagonal bracing, flange bracing, portal bracing. Round bar, angle, H-section bracing members with end connections.

馃彚

Steel Platforms

Process platforms, equipment support platforms, mezzanine floors, access platforms, stairways. Main beams, secondary beams, decking, handrails.

馃敆

Connection Plates & Brackets

Gusset plates, stiffener plates, end plates, base plates, bearing plates, cleats, brackets. Precision drilled and cut per connection details.

馃彮

Custom Fabricated Components

Custom heavy steel components, complex built-up members, specialized connections, non-standard structural elements. Manufactured to your specific drawings and requirements.

Raw Structural Steel vs. Fabricated Structural Steel

ZhongSai's core value is fabrication 鈥?not simply selling steel material.

AspectRaw Structural Steel (Material Trading)Fabricated Structural Steel (ZhongSai)
What you receiveStandard steel sections in stock lengths. No cutting, no holes, no welding.Components manufactured to your project drawings 鈥?cut, drilled, welded, assembled, surface treated.
Input requiredSection size, grade, quantity, length.Project drawings, BOQ, technical specifications, design standard.
Value addedMaterial supply only. You handle all fabrication locally.Engineering review 鈫?detailing 鈫?cutting 鈫?drilling 鈫?assembly 鈫?welding 鈫?surface treatment 鈫?QC 鈫?marking 鈫?packing.
On-site workRequires local fabrication shop: cutting, drilling, welding, surface treatment.Components arrive ready for erection. Bolted connections 鈥?minimal on-site welding required.
Quality controlMaterial certificate only. No fabrication QC.Material verification + dimensional inspection + welding inspection + surface treatment inspection + final inspection.
Component markingNo member marking. You identify and mark on site.Every component marked with unique member number matching erection drawings.
Best forBuyers with their own fabrication shop needing raw material only.Contractors, owners and importers who need ready-to-erect fabricated components for overseas projects.

From Drawing to Component

How your project drawings become fabricated, inspected and export-ready components.

1

Drawing / BOQ

You provide project drawings and BOQ

2

Engineering Review

Fabricability review and clarification

3

Detailing

Shop drawings if required

4

Material Prep

Steel procurement and verification

5

Fabrication

Cutting, drilling, assembly, welding

6

QC

Dimensional, welding, coating inspection

7

Marking

Member numbering per erection drawings

8

Packing

Assembly-group packing with lists

9

Export

Container loading and documentation

10

Support

Remote technical guidance on request

鈫?Structural Steel Fabrication 鈫?Steel Detailing Services 鈫?Export From China

Component Applications

Fabricated structural steel components for a wide range of project types.

馃彮

Factory Buildings

馃摝

Warehouses

馃彈锔?/div>

Industrial Buildings

鉀忥笍

Mining Facilities

馃彚

Platforms

馃彧

Commercial Buildings

馃彑锔?/div>

Sports Arenas

馃彣

Hotels

馃殫

Auto Plants

馃敡

Special Projects

Materials & Supporting Systems

Components are the core. Materials and supporting systems complete the package.

Note: Materials & Components are a supporting cluster. Fabricated Structural Steel Components (this page) is the core commercial product 鈥?manufactured to your drawings with full fabrication, QC and export preparation.

Quality Control Process

Every component passes through our multi-stage quality control process.

1. Material Verification

Steel material certificates checked against order requirements. Visual inspection of material surface. Material traceability maintained throughout production.

2. Dimensional Inspection

Cutting accuracy, hole position and diameter, assembly dimensions, overall length and squareness checked at each production stage. Final dimensional verification before surface treatment.

3. Welding Inspection

Welder qualification verification. Welding procedure specification (WPS) compliance. Visual inspection of all welds. Non-destructive testing (UT/MT/PT) where specified by project requirements.

4. Surface Treatment Inspection

Blast cleaning grade verification (Sa 2.5 for paint systems). Dry film thickness (DFT) measurement of primer and topcoat. Adhesion testing where required. Galvanizing thickness and appearance check.

5. Final Inspection

Complete component inspection against drawings: dimensions, hole patterns, welds, markings, surface treatment. Component marking verified against erection drawing numbering. Packing list cross-checked with actual contents.

馃搵 Documentation

Material certificates (Mill Test Reports), welding procedure records, inspection reports, coating thickness records, packing lists. Documentation package provided with each shipment as required.

Information Required for Component Quotation

Providing the following information helps us deliver an accurate and timely quotation.

馃實

Project Country

Country and destination

馃搻

Structural Drawings

DWG/DXF/PDF/IFC

馃搵

BOQ (if available)

Bill of quantities

馃敥

Component Type

Beams, columns, trusses

鈿栵笍

Quantity / Tonnage

Total weight or piece count

馃И

Steel Grade

Q355B, A36, S355

馃搹

Design Standard

GB, ASTM/AISC, EN, AS

馃帹

Surface Treatment

Paint or galvanizing

馃搮

Delivery Requirement

Required schedule

馃摝

Special Requirements

NDT, marking, packing

Frequently Asked Questions

Common questions about fabricated structural steel components.

Can you manufacture structural steel from our drawings?+

Yes. Our core service is fabricating structural steel components from your project drawings, BOQ and technical specifications. We accept DWG, DXF, PDF and IFC formats. Our engineering team reviews your drawings for fabrication feasibility, then produces shop drawings and manufactures the components to your specified standards (GB, ASTM/AISC, EN/Eurocode, AS). We are not a raw steel trader 鈥?every component goes through cutting, drilling, assembly, welding, surface treatment, inspection and marking before packing.

Do you sell fabricated beams and columns?+

Yes. We supply fabricated steel beams (H beams, plate girders, crane runway beams, rafters), steel columns (wide-flange columns, built-up columns, box columns, stepped columns), welded H sections, and custom fabricated structural components. Each component is manufactured to your drawings with the correct dimensions, hole patterns, connection details, welds and surface treatment. We do not sell raw steel sections without fabrication 鈥?our value is in the manufacturing, QC and export preparation.

Can you provide steel detailing before fabrication?+

Yes. If you have engineering design drawings but need fabrication-level detailing, we can provide structural steel detailing services including 3D modeling, member detailing, connection details, material lists (BOM), shop drawings and erection drawings. Detailing is connected directly to our fabrication 鈥?the drawings we produce are the drawings we manufacture from. This eliminates the gap between detailing office and fabrication shop. If you already have complete shop drawings, we can fabricate directly from them.

What information is required for a component quotation?+

For an accurate structural steel component quotation, we need: project country and destination, structural drawings (DWG/DXF/PDF/IFC), BOQ if available, component types (beams, columns, trusses, etc.), total quantity or tonnage, steel grade requirements (Q355B, A36, A572, S355, etc.), applicable design standard (GB, ASTM/AISC, EN, AS), surface treatment requirements (paint system, hot-dip galvanizing), and required delivery schedule. The more complete your drawings and BOQ, the more accurate our quotation will be.

Can components be marked according to erection drawings?+

Yes. Every fabricated component is marked with a unique member number corresponding to your erection drawings. We use piece marks, assembly numbers and orientation indicators so your on-site installation team can identify each component and place it in the correct location. Marking is done with durable paint or stamping, and is verified during final inspection before packing. Each container's packing list cross-references member numbers to erection drawings, making on-site assembly efficient.

How are structural steel components packed for export?+

Structural steel components are packed by assembly group for efficient international shipping. Primary beams and columns are bundled with protective wrapping and member marking. Trusses and bracing are bundled by type. Small items (connection plates, brackets, bolts, fasteners) are boxed with detailed packing lists. Machined surfaces and bolt holes are protected. We optimize container loading to maximize weight and volume utilization. Long members may require open-top or flat-rack containers. Each container has a detailed packing list cross-referenced to erection drawings.

Do you provide installation drawings?+

Yes. We provide complete erection drawings including: general arrangement drawings, assembly sequence drawings, connection details, bolt schedules, member location plans, and foundation anchor bolt layouts. These drawings guide your local installation team through the entire erection process. We also provide installation manuals and remote technical support via video call and email. For complex or large projects, we can dispatch engineers to your site for installation supervision and training. Note: we do not perform on-site construction ourselves 鈥?we provide technical guidance for your local installation team.

Scope of Supply

ZhongSai Steel Structure is a China-based steel structure manufacturer and export supplier. We focus on engineering coordination, steel detailing, fabrication, material supply, export preparation, logistics coordination and overseas installation technical guidance. Local construction is carried out by the client or their local construction team.

Prefer to talk directly? Contact our sales team:

馃摫 WhatsApp: +86 131 9200 7378 馃摟 Email: [email protected]