High-strength cold-formed steel purlins and girts for secondary framing of metal building roofs and walls. Available in C, Z, and Sigma profiles with various zinc coatings, pre-punched holes, and custom lengths up to 12 meters.
| Parameter | Specification |
|---|---|
| Steel Grade | Q235B, Q345B, S280GD+Z, S350GD+Z, S550GD+Z |
| Section Type | C purlin (lipped channel), Z purlin (lipped Z), Sigma purlin |
| Web Height | 80mm, 100mm, 120mm, 140mm, 160mm, 180mm, 200mm, 250mm, 300mm |
| Flange Width | 40mm - 80mm (standard 50mm, 60mm, 65mm) |
| Thickness | 1.5mm, 1.8mm, 2.0mm, 2.3mm, 2.5mm, 3.0mm |
| Zinc Coating | Z60 (60g/m²), Z100 (100g/m²), Z180 (180g/m²), Z275 (275g/m²) |
| Length | Up to 12m standard; custom lengths available |
| Pre-punched Holes | Bolt holes per design, slotted holes for adjustment |
| Standard | GB/T 6728, EN 10162, ASTM A653 |
Secondary framing supporting roof sheeting and insulation. Z purlins preferred for roof slopes over 15° for better lap connection.
Horizontal wall framing members supporting wall cladding. C purlins commonly used for wall applications.
Floor joists for mezzanine levels in warehouses and factories, supporting floor decking and live loads.
Support structures for rooftop solar panel installations, corrosion-resistant galvanized finish.
A: C purlins have parallel flanges, ideal for walls and low-slope roofs. Z purlins have overlapping flanges that create a continuous beam effect, offering 20-30% higher load capacity for roof slopes over 15°. Z purlins are typically more cost-effective for long-span roofs.
A: For coastal or high-humidity environments, Z275 (275g/m²) minimum is recommended. For severe corrosion environments (salt spray, chemical exposure), consider Z350 or pre-painted purlins with additional corrosion protection.
A: Yes, Z purlins are designed for lapped splices (typically 400-600mm overlap) to achieve continuous spans. C purlins require bolted splice plates. Maximum single length is 12m due to transport constraints; longer spans use spliced sections.
Get a competitive quote within 24 hours. Factory direct supply, quality guaranteed, export to 60+ countries.