High-quality H-shaped steel sections for primary framing of industrial buildings, warehouses, workshops, and multi-story structures. Available in standard European (IPE/HEA/HEB), American (W/Wide Flange), and Chinese (GB) standards, with custom fabrication options.
| Parameter | Specification |
|---|---|
| Steel Grade | Q235B, Q355B, ASTM A36, ASTM A572 Gr.50, S235JR, S355JR |
| Standard Sizes | IPE 100-600, HEA 100-1000, HEB 100-1000, W4-W44, GB HN/HM/HN 100-900 |
| Web Height (h) | 100mm - 1000mm (custom up to 2000mm) |
| Flange Width (b) | 50mm - 400mm (custom up to 500mm) |
| Web Thickness (tw) | 4.5mm - 20mm |
| Flange Thickness (tf) | 6.8mm - 36mm |
| Length | 6m, 9m, 12m standard; custom up to 18m (or spliced for longer spans) |
| Surface Treatment | Black (as rolled), Shot blasted (SA2.5), Primed (red oxide / zinc-rich), Hot-dip galvanized |
| Tolerance Standard | GB/T 11263, EN 10034, ASTM A6 |
| Certification | ISO 9001, Mill Test Certificate (EN 10204 3.1), CE marking available |
Main columns and rafters for portal frame buildings — warehouses, workshops, factories, and industrial facilities.
Columns and beams for steel-framed office buildings, commercial complexes, and mixed-use structures.
Crane runway beams, equipment platforms, pipe racks, and mining infrastructure requiring high load capacity.
Bridge girders, support columns, and structural components for transportation and public infrastructure.
H beams are packed to maximize container space utilization and protect surfaces during transit:
A: For standard sizes, MOQ is 5 tons. For custom fabrication, MOQ is 10 tons or one 20ft container. Smaller quantities can be discussed for sample orders.
A: Yes, we supply ASTM A36, A572 Grade 50, and other international grades. Mill Test Certificate (EN 10204 3.1) is provided with each shipment.
A: Standard sizes in stock: 7-15 days. Custom fabrication (cutting, drilling, welding): 15-25 days. Large projects (100+ tons): 25-40 days depending on complexity.
A: Yes, hot-dip galvanizing is available per ASTM A123 / EN ISO 1461. Typical coating thickness: 85μm for sections over 6mm thickness. Galvanizing adds approximately 15-20% to material cost.
A: Yes, for spans exceeding standard 12m length, beams can be spliced using bolted end-plate connections or welded splices. Splice locations are designed to avoid high-moment zones. We provide detailed splice design calculations.
Get a competitive quote within 24 hours. Standard sizes in stock, custom fabrication available. Mill Test Certificate included with every shipment.