Industrial Doors & Windows for Steel Buildings

Complete range of industrial doors, windows, and enclosure components designed for steel structure buildings. From heavy-duty overhead doors for warehouses to personnel doors and natural lighting solutions, we supply custom-sized openings with full hardware and installation guidance.

Product Range

Product Type Typical Sizes Material Applications
Overhead Sectional DoorsW: 2.5-6m, H: 2.5-5.5m40mm sandwich panel (steel/PU), galvanized steel tracksWarehouses, loading docks, factories, fire stations
Roller ShuttersW: 2-8m, H: 2-6mGalvanized steel slats (0.6-1.0mm), aluminum slats optionStorefronts, garages, loading bays, security entrances
Industrial Sliding DoorsW: 4-20m, H: 3-8mSteel frame + sandwich panel, top-hung track systemAircraft hangars, large workshops, mining facilities, warehouses
Personnel DoorsW: 0.9-1.2m, H: 2.1-2.4mSteel frame + insulated panel, glass vision panel optionOffice entrances, factory access, restrooms, utility rooms
Steel WindowsW: 0.9-3m, H: 0.9-1.8mGalvanized steel frame, single/double glazing, sliding/awning/casementFactory walls, offices, workshops, break rooms
Louvers & VentsW: 0.6-2m, H: 0.6-2mAluminum or galvanized steel, bird/insect screen optionWall ventilation, equipment rooms, generator rooms, gable vents
Roof SkylightsW: 0.8-1.5m, L: 2-10mFRP (fiberglass) or polycarbonate, matching roof profileNatural lighting for warehouses, factories, workshops, sports halls
Fire-Rated DoorsW: 0.9-1.5m, H: 2.1-2.4mSteel frame + fire-resistant core, intumescent seals, 1-3 hour ratingFire exits, stairwells, equipment rooms, hazardous areas

Overhead Sectional Door Details

Panel Construction

40mm thick double-skinned steel sandwich panel with PU foam core (density 40-45 kg/m³). Steel skin 0.4-0.5mm galvanized + color-coated. U-value: 0.5-0.8 W/m²·K.

Track & Hardware

Galvanized steel vertical/horizontal tracks (2.0-3.0mm), nylon rollers with steel bearings, torsion spring system, manual chain hoist or electric operator (24V/220V/380V).

Safety Features

Photo eye safety sensors, bottom edge safety sensor (auto-reverse on obstruction), manual release cord, emergency stop, spring breakage protection, cable breakage protection.

Options

Vision panels (acrylic/polycarbonate), pedestrian wicket door, high-speed operation (up to 0.5m/s), insulated tracks, wind load reinforcement, remote control, traffic light integration.

Natural Lighting Solutions

FRP Roof Skylights

Polycarbonate Sheets

Ventilation & Louver Systems

Wall Louvers

Aluminum or galvanized steel frame with adjustable or fixed blades. Sizes 600x600mm to 2000x2000mm. Bird screen and insect mesh options. For wall ventilation, generator rooms, equipment cooling.

Ridge Ventilators

Continuous ridge ventilation for pitched roofs. Aluminum or steel construction, 300-600mm throat width. Weatherproof design with rain defense. Natural exhaust ventilation, no power required.

Turbo Ventilators

Wind-driven turbine ventilators for roof exhaust. Sizes 300mm, 400mm, 500mm, 600mm diameter. Aluminum or stainless steel, maintenance-free. Exhaust capacity: 1000-5000 m³/h depending on wind speed.

Powered Exhaust Fans

Industrial axial and centrifugal exhaust fans for roof or wall mounting. Sizes 400-1200mm, airflow 5000-50000 m³/h. 220V/380V, IP55 motors, galvanized steel or FRP construction. With gravity shutters or louvers.

Quality & Standards

Packing & Delivery

Frequently Asked Questions

Q: What door type is best for a warehouse loading dock?

A: For standard warehouse loading docks (3-4m wide, 3-4m high), overhead sectional doors are the most popular choice — they provide good insulation, fast operation, and roll up vertically to save interior space. For high-traffic docks (50+ operations/day), high-speed roller doors (PVC or aluminum) with 1-2 second opening speed reduce energy loss. For very large openings (6m+), industrial sliding doors or folding doors are more economical. We recommend based on: opening size, frequency of use, insulation requirements, wind conditions, and budget.

Q: How much natural lighting is recommended for a factory building?

A: As a general guideline, skylight area should be 5-10% of floor area for warehouses and factories. This provides 300-500 lux of natural daylight at floor level on a sunny day, sufficient for most industrial tasks without artificial lighting during daytime. For precision work or offices, 10-15% skylight ratio is recommended. FRP skylights with 50-75% light transmission are most common — they provide bright but diffused light without glare. We calculate optimal skylight placement based on: building orientation, roof slope, latitude, local sunshine hours, and interior usage requirements.

Q: Can doors and windows be installed by our local contractor?

A: Yes, all our doors and windows are designed for straightforward installation by local contractors. We provide: (1) detailed installation drawings with anchor bolt locations and rough opening dimensions; (2) step-by-step installation manuals (in English, with photos); (3) pre-assembled door/window units with all hardware attached; (4) video installation guides for complex products; (5) remote technical support via WhatsApp/email during installation. For first-time installations, we recommend a 1-2 day remote supervision session with our engineer. Typical installation time: 2-4 hours per overhead door (2 workers), 30-60 minutes per personnel door/window.

Q: What wind load rating is needed for coastal projects?

A: For coastal areas (within 50km of coastline), we recommend doors and windows designed for minimum 0.7 kN/m² wind pressure (equivalent to ~120 km/h wind speed). For hurricane/cyclone zones (e.g., Philippines, Caribbean, Gulf of Mexico), use 1.0-1.5 kN/m² rating with reinforced tracks, impact-resistant glazing, and additional anchor points. Our standard doors are rated for 0.5 kN/m²; reinforced options add 15-30% to cost but prevent catastrophic failure during storms. We provide wind load calculations per local building code (ASCE 7, EN 1991-1-4, GB 50009) for every project.

Q: Do you supply fire-rated doors with certification?

A: Yes, we supply fire-rated personnel doors with 30, 60, 90, and 120 minute ratings, tested per EN 1634-1 and ASTM E152. Each door comes with: (1) third-party test report from accredited laboratory; (2) CE marking (for EU projects); (3) fire door label with rating and manufacturer code; (4) intumescent seals and fire-rated hardware (hinges, locks, closers). Fire doors are required for: fire exits, stairwell enclosures, equipment rooms, hazardous material storage, and connections between fire compartments. We provide fire door schedules as part of our complete building package, ensuring compliance with local fire code.

Need Doors & Windows for Your Building?

Get a complete openings package with custom sizes, full hardware, installation guidance, and certification. Factory direct price, export to 60+ countries.