China steel structure manufacturer & export supplier. Upload your drawings for engineering review, or tell us your project requirements. 15+ years export experience, 100,000m² factory, ISO 9001 certified.
Upload your structural drawings, BOQ or specifications. Our engineering team will review and provide a detailed quotation with material breakdown.
Tell us about your project: country, building type, dimensions, intended use. We will provide a preliminary design proposal and budget estimate.
Send your structural drawings, BOQ or specifications. Engineering review included, no obligation.
No drawings needed. Tell us your project basics and we will provide a preliminary design proposal and budget estimate.
ZhongSai Steel Structure is a China-based manufacturer and export supplier. We provide: design detailing, steel fabrication, complete material supply, packing, container loading, export documentation, logistics coordination, and overseas installation technical guidance.
We are NOT a local construction contractor, general contractor, or EPC contractor in your country. We do not perform on-site construction or local civil works. Our team provides remote technical guidance and drawing support for your local installation team.