`n

Large Span Steel Structure Sports Arena

ZhongSai Steel Structure — Manufacturer of large span steel structure sports arenas and gymnasiums. Column-free interior, high ceiling, truss roof design. Design, manufacturing, export and installation guidance only.

Get Free Quote → Chat on WhatsApp
Large Span Steel Structure Sports Arena

Large Span Steel Structure Sports Arena

ZhongSai Steel Structure — Manufacturer of large span steel structure sports arenas and gymnasiums. Column-free interior, high ceiling, truss roof design. Design, manufacturing, export and installation guidance only.

Key Features

  • Clear span up to 60m
  • Column-free interior
  • High ceiling 8-15m
  • Truss roof design
  • Fast construction 40-60 days

Technical Specifications

Span30-60m
Height8-15m
Steel GradeQ355B/Q420B
Roof TypeSpace truss
Production Time40-60 days

Our Process

1

Design

Custom structural design per your requirements

2

Manufacturing

Precision fabrication in our 100,000m² factory

3

Export

Professional packing, container loading, customs clearance

4

Installation Guidance

Technical drawings, video guides, on-site supervision — we do NOT do installation

⚠️ We provide design, manufacturing, export and installation technical guidance ONLY. We do NOT perform on-site construction or installation.

Frequently Asked Questions

How long does it take to manufacture a large span steel structure sports arena?+

Standard production takes 15-60 days depending on size and complexity. Rush orders available.

Do you provide installation services?+

No, we do not perform on-site installation. We provide detailed installation drawings, bolt lists, video guides, and can send technical supervisors to train your local team. We provide installation technical guidance only.

What steel grades do you use?+

We primarily use Q355B (GB/T 1591) for main frames, equivalent to S355JR (EN 10025). Q235B for purlins and secondary members. Custom grades available on request.

Can you customize the design?+

Yes, every project is custom designed based on your dimensions, load requirements, local building codes, and aesthetic preferences. Send us your drawings or specifications for a free quote.

Ready to Start Your Project?

Get a free, no-obligation quote within 24 hours. Our engineering team will design the optimal solution for your requirements.