`n
Steel Hangar

Steel Structure Hangar & Aircraft Hangar Manufacturer in China

Large clear-span steel hangars for aircraft, helicopters, and maintenance facilities. Custom design with hydraulic/sliding doors, engineered for your aircraft dimensions.

Get a Free Quote WhatsApp Us

About Steel Hangar & Aircraft Hangar

A steel structure hangar is the ideal building solution for aircraft storage, helicopter maintenance, aviation repair facilities, and industrial large-door applications. ZhongSai Steel Structure designs and manufactures custom steel hangars with clear-span widths up to 80 meters, accommodating aircraft of all sizes from small private planes to commercial jets and helicopters.

Our steel hangars feature large opening doors (sliding, hydraulic, or fabric), high clearances for aircraft tails, reinforced structures for wind and seismic loads, and optional insulation for climate control. We design every hangar based on your specific aircraft dimensions, door requirements, local climate, and site conditions.

Whether you need a single-aircraft private hangar, a multi-aircraft commercial hangar, a helicopter maintenance facility, or an industrial large-door workshop, we can deliver a cost-effective, durable steel hangar solution. We provide complete services from design to manufacturing and export, with installation guidance for your local construction team.

Advantages of ZhongSai Steel Hangar & Aircraft Hangar

🏭 Direct Factory

100,000m² manufacturing facility, 300+ skilled workers, 100,000 tons annual capacity. No middlemen, competitive pricing.

📐 Custom Design

Professional engineering team provides custom design based on your requirements, local climate, and building codes.

🌍 Global Export

Exported to 60+ countries, 700+ containers per year. We handle customs clearance and shipping to your port.

🔧 Installation Guidance

We provide detailed installation drawings, video guidance, and can send engineers to your site for supervision. We do not do on-site installation.

Typical Applications of Steel Hangar & Aircraft Hangar

Private Aircraft Hangar

Single or double aircraft hangars for private aviation, with custom sizes and finishes

Commercial Aircraft Hangar

Large clear-span hangars for commercial jets, with tail clearance and multiple bays

Helicopter Hangar

Compact steel hangars for helicopter storage and maintenance, with wide opening doors

Aircraft Maintenance Hangar

Heavy-duty hangars with crane systems, workshops, and parts storage for MRO facilities

Industrial Large-Door Building

Steel buildings with oversized doors for industrial equipment, marine, and large machinery

Agricultural Equipment Hangar

Large-door steel buildings for farm equipment, tractors, and harvesting machinery storage

Technical Specifications

ParameterSpecification
Steel GradeQ355B / Q235B (GB standard), equivalent to ASTM A572 / A36
Clear Span Width15-80m (single span, no interior columns), multi-span available
Building Height6-20m (eave height), custom for aircraft tail clearance
Door TypeSliding door, hydraulic lift door, fabric door, bi-fold door, custom sizes
Door Opening Width10-70m, custom based on aircraft wingspan
Roof Load0.3-0.5 kN/m² (snow load), custom based on local climate
Wind ResistanceUp to 150 km/h for exposed airport sites, custom available
InsulationSandwich panels (EPS/rock wool/PU), 50-150mm, for climate control
Crane SystemOptional overhead crane (5-30 tons) for maintenance hangars
Lighting & ElectricalHigh-bay LED lighting, power outlets, custom electrical layout
Delivery Time35-50 days after deposit and drawing confirmation

Successful Steel Hangar & Aircraft Hangar Projects

40m Clear-Span Aircraft Hangar

40m Clear-Span Aircraft Hangar

Cairo, Egypt

Large clear-span steel hangar for commercial jets, 40m span, 15m height, hydraulic door

Helicopter Maintenance Hangar

Helicopter Maintenance Hangar

Lagos, Nigeria

25m span steel hangar for helicopter fleet, with workshop and parts storage areas

Private Twin-Engine Hangar

Private Twin-Engine Hangar

Johannesburg, South Africa

20m span insulated steel hangar for private aircraft, with office and lounge area

How We Work — Design → Manufacture → Export → Guidance

📐

1. Design

Custom structural design based on your requirements and local codes

🏭

2. Manufacture

Precision manufacturing in our 100,000m² factory with QC at every step

🚢

3. Export

Container loading, customs clearance, and shipping to your destination port

🔧

4. Guidance

Detailed drawings, video guidance, and optional engineer on-site supervision

📌 Note: We design, manufacture, and export steel structures. We do NOT perform on-site installation construction.

Frequently Asked Questions About Steel Hangar & Aircraft Hangar

1. What size hangar do I need for my aircraft?

The hangar size depends on your aircraft wingspan, length, and tail height. As a general guide: small single-engine planes need 12-15m span, twin-engine planes need 18-25m span, small jets need 25-35m span, and commercial jets need 40-60m+ span. We recommend adding 3-5m clearance on each side and 1-2m at the tail. Send us your aircraft specifications and we will design the optimal hangar size.

2. What type of door is best for an aircraft hangar?

The best door type depends on your hangar size, budget, and usage frequency: Sliding doors are most common and cost-effective for hangars up to 40m wide; Hydraulic lift doors are ideal for frequent use and provide full opening; Bi-fold doors are good for medium-sized hangars; Fabric doors are a cost-effective option for temporary or low-budget applications. We will recommend the best door type based on your requirements.

3. Can you design a hangar with an office or living area?

Absolutely! We frequently design hangars with integrated office spaces, pilot lounges, conference rooms, workshops, parts storage, and even living quarters (hangar homes). We can design a mezzanine floor or a separate attached wing for these spaces. We will work with you to optimize the layout for both aircraft storage and your additional space needs.

4. How do you handle wind loads for airport hangars?

Airport sites are often exposed and subject to high winds. We design hangars with enhanced wind resistance: reinforced column bases, heavier steel sections, bracing systems, and wind-resistant door designs. We design based on your local wind speed data (up to 150 km/h for typhoon-prone areas) and can provide wind load calculations for local authority approval. We also recommend proper site orientation to minimize wind exposure.

5. What is the lifespan of a steel hangar?

A properly designed and maintained steel hangar has a structural lifespan of 50+ years. The steel frame is designed for 50-year structural life. With regular maintenance (repainting every 10-15 years, checking door mechanisms, gutter cleaning), the building will serve you for decades. The door systems typically last 20-30 years with proper maintenance and can be replaced independently of the steel frame.

6. Do you provide installation guidance for hangars?

Yes! We provide detailed erection drawings, step-by-step installation manuals, and video tutorials specifically for hangar construction (including door installation). We can also send our engineers to your site for supervision and training of your local installation team. However, we do NOT perform on-site installation ourselves. Hangars with large doors may require specialized door installation technicians, which we can help coordinate.

Ready to Start Your Steel Hangar & Aircraft Hangar Project?

Get a free custom quote within 24 hours. Our engineering team will design the perfect steel structure solution for your needs.

Get a Free Quote WhatsApp: +86 131 9200 7378

Email: [email protected] | Phone: +86 131 1327 0408