C/Z Purlin — Cold-Formed Galvanized Steel Purlins

High-strength cold-formed steel purlins and girts for secondary framing of metal building roofs and walls. Available in C, Z, and Sigma profiles with various zinc coatings, pre-punched holes, and custom lengths up to 12 meters.

Technical Specifications

Parameter Specification
Steel GradeQ235B, Q345B, S280GD+Z, S350GD+Z, S550GD+Z
Section TypeC purlin (lipped channel), Z purlin (lipped Z), Sigma purlin
Web Height80mm, 100mm, 120mm, 140mm, 160mm, 180mm, 200mm, 250mm, 300mm
Flange Width40mm - 80mm (standard 50mm, 60mm, 65mm)
Thickness1.5mm, 1.8mm, 2.0mm, 2.3mm, 2.5mm, 3.0mm
Zinc CoatingZ60 (60g/m²), Z100 (100g/m²), Z180 (180g/m²), Z275 (275g/m²)
LengthUp to 12m standard; custom lengths available
Pre-punched HolesBolt holes per design, slotted holes for adjustment
StandardGB/T 6728, EN 10162, ASTM A653

Applications

Roof Purlins

Secondary framing supporting roof sheeting and insulation. Z purlins preferred for roof slopes over 15° for better lap connection.

Wall Girts

Horizontal wall framing members supporting wall cladding. C purlins commonly used for wall applications.

Mezzanine Floors

Floor joists for mezzanine levels in warehouses and factories, supporting floor decking and live loads.

Solar Panel Mounting

Support structures for rooftop solar panel installations, corrosion-resistant galvanized finish.

Features & Options

Packing & Delivery

Frequently Asked Questions

Q: What is the difference between C and Z purlins?

A: C purlins have parallel flanges, ideal for walls and low-slope roofs. Z purlins have overlapping flanges that create a continuous beam effect, offering 20-30% higher load capacity for roof slopes over 15°. Z purlins are typically more cost-effective for long-span roofs.

Q: What zinc coating is recommended for coastal areas?

A: For coastal or high-humidity environments, Z275 (275g/m²) minimum is recommended. For severe corrosion environments (salt spray, chemical exposure), consider Z350 or pre-painted purlins with additional corrosion protection.

Q: Can purlins be spliced for longer spans?

A: Yes, Z purlins are designed for lapped splices (typically 400-600mm overlap) to achieve continuous spans. C purlins require bolted splice plates. Maximum single length is 12m due to transport constraints; longer spans use spliced sections.

Need C/Z Purlin for Your Project?

Get a competitive quote within 24 hours. Factory direct supply, quality guaranteed, export to 60+ countries.